phase 3
contents.gif (1846 bytes)
O úroveň výše (up) phase 1 phase 2 phase 3

Attempt to reconstruct the cog-wheel roll-on to cog - phase 3.

phase1 back to Abt's points

  Originally the track was built with the adhesive points, but the rails within station were with cog. Due to traffic arguments the points were replaced by cog ones soon.
  Destroying of this technical memory was a barbarian act, but on the other hand, the most original state was returned.
  Today, the rail parts without the cog are no more the problem for the traffic: except the nostalgic trains the adhesive engines are used.